RebotaREBOTA/Works Search tools, standards, templates… Ctrl K Rebota →
Calculators Standards Templates Checklists Estimators Learn Community Search Rebota (business platform) →
🏭 Production

Manufacturing ERP with real BOM explosion and shop-floor tracking

BOM to finished goods, on one connected platform — production orders post real inventory transactions, not a spreadsheet pretending to be a shop floor.

Industry Optimized
What makes Manufacturing & Fabrication hard to run on spreadsheets

Material planning happens in spreadsheets

Without a system reconciling demand against stock, plants either overstock or run short at the worst time.

Raw material yield loss goes unmeasured

Scrap and wastage rates are estimated, not tracked line-by-line against what was actually consumed.

Machine utilization is a guess

Without logged idle vs active time, it is hard to know which equipment is actually earning its cost.

How the workflow runs on Rebota
Steps marked "in development" are on the roadmap, not live yet — shown for transparency, not as a current capability.
Material Requirement Planning
Plan against demand
Live today
Procurement
RFQ → PO for raw material
Live today
Inventory Receipt
Stock ledger updated
Live today
BOM
Multi-level, versioned, approval status
Live today
Production Order
Explodes BOM into material requirements
Live today
Shop-Floor Stages
Work-center sequencing, capacity-checked against daily hours
Live today
Quality Control
QC checklists, NCR
Live today
Finished Goods
Real inventory posting on completion
Live today
Costing
Material, labour, overhead roll-up
Live today
Module matrix
Business requirementRebota capabilityRelevanceStatus
Material Planning MRP High Available
Procurement Purchase Orders, RFQ / Quote Comparison High Available
Inventory Inventory & Stock High Available
Bill of Materials Product BOM (multi-level, versioned, revision-controlled) High Available
Production / Work Orders Production Orders, Shop-Floor Stages High Available
Work Center Capacity Work Centers with daily capacity (hours/day) — scheduling a stage checks already-planned hours and warns before overbooking a work center Medium Available
Quality Control Quality & NCR Medium Available
Cost Control Cost Control (material, labour, overhead) High Available
Calculators, guides & comparisons for this industry
Real, published Rebota Intelligence Center content — industry-specific tools first, cross-industry tools (GST, cash flow, equipment) after.
Related industries
Frequently Asked Questions
Does Rebota support BOM and shop-floor tracking?
Yes — multi-level BOM with revision control, production orders that explode a BOM into material requirements, work-center-sequenced shop-floor stages, and real inventory postings on material issue and finished-goods completion.
How does a production order affect stock?
Creating a production order snapshots the BOM (protecting in-progress orders from later BOM edits); material issue and finished-goods completion post real transactions into the same inventory ledger used everywhere else in Rebota.
Does Rebota prevent overbooking a machine or work center?
Yes — each work center has a daily capacity in hours. Scheduling a shop-floor stage sums what is already planned for that work center on that date and warns if the new stage would push it over capacity, rather than silently double-booking it.
Save & Access Anywhere
Save your favorite tools & resources
Smart Search (Ctrl+K)
Find what you need in seconds
Community Support
Ask questions & get real answers
Regularly Updated
New tools, templates & guides added
See Rebota configured for Manufacturing & FabricationFree 30-day trial, no credit card required.
Start Free Trial